Safety protection measures for chemical filling machines
Oct 18, 2024

Chemical filling machines involve a variety of chemicals during operation, so safety protection measures are particularly important. The following are some key safety protection measures sorted out based on search results:
1. Equipment maintenance and inspection
- Regular inspection: Operators should regularly check the connection, fixing, sealing, electrical and other parts of the filling machine equipment to ensure that the equipment is in good condition.
- Comprehensive safety inspection: Before the start of the operation, a comprehensive safety inspection of the workplace should be carried out. If safety hazards are found, they should be dealt with on site first. Only after confirming safety can the operation begin.
2. Personal protective equipment
- Wearing protective equipment: Operators must wear protective equipment that meets the requirements when working, such as protective glasses, rubber gloves, etc.
3. Technical inspection and evaluation
- Regular technical inspection: Various gas cylinders must be regularly technically inspected and evaluated in strict accordance with the prescribed time and content to ensure safety.
4. Operating procedures and training
- Operating procedures: Operators should strictly abide by the operating procedures, such as standing on the side of the valve when operating the valve, and proceed slowly to avoid excessive friction heat or static electricity.
- Personnel training: Strengthen personnel training, organize technical backbones, especially old comrades with certain practical experience, summarize experience and lessons, continuously accumulate good working methods, and implement equipment operating procedures and safety systems.
5. Emergency treatment measures
- Emergency treatment: During the operation, if abnormal phenomena such as increased pressure on the roof and coal wall, loose roof, slurry leakage, and sudden drop in grouting pressure are found, the grouting should be stopped immediately, the cause should be found out, and measures should be taken. Grouting construction can only be resumed after safety is confirmed.
6. Equipment maintenance and maintenance
- Equipment maintenance: Strengthen the equipment maintenance level, and the equipment cannot be positioned as "available" level. Regularly maintain and replace key components such as oil-water separators and dryers to ensure the normal operation of the equipment.
Through the implementation of the above safety protection measures, the safety risks in the operation of the chemical filling machine can be effectively reduced, and the personal safety of operators and the safety of equipment can be protected.